Solutions

Resources.

Mines, oil and gas producers, farms and grain elevators, forestry, and quarries.

Every load, the same way

05
01
Camera frames, payload readings, and dispatch records, as each truck runs.
02
Each tray read from the camera, and every reading tied to its truck and its load.
03
The shovel, the truck, the dispatch record, and the block checked against each other.
04
A destination proposed for each flagged load, with the frame and the readings beside it.
05
Decided by your dispatcher, and approved by the person on your team who approves it today.
Example

Mining company.

Every field traced to the source it came from.

Dispatch recordHT214, LOADED 02:41ASSIGNED: PRIMARY CRUSHER
Grade control blockBLOCK 1140-22: ORE
Shovel payload58 + 57 + 59 + 57 t
Truck payload monitorPAYLOAD 218.0 t
Haul road camera2 BLOCKS OVER THE SET LIMIT
Draft load record, truck 214, night shiftSample
TruckTruck 214
DestinationPrimary crusher
MaterialOre
Shovel passes231 t
Payload218 t
The shovel's four passes add up to 231 t. Sent to your dispatcher.
OversizeFor your dispatcher
Whether to send it away from the crusher is your dispatcher's call. The frame is shown beside it.

Your morning.

Ready for the day shift4
Night shift loadsRead and matched to the dispatch record.
Oversize loadSent to the stockpile on your dispatcher's call.
Crusher stopLoads reassigned by your dispatcher while it was down.
Tonnes against planShift tonnes compared with the mine plan, by block.
Need your decision2
Payload differsShovel passes 231 t. Truck payload monitor 218 t.
Dump locationDumped at the waste dump. Its block says ore.
Waiting on the crusher operator1
Request draftedFor the restart time missing from the dispatch record. Ready for you to send.
Documents we read
  • Haul road and truck tray camera feeds
  • Shovel and truck payload readings
  • Fleet dispatch records
  • Grade control blocks and the mine plan
  • Weight and moisture certificates
  • Assay certificates
  • Sales contracts
  • Provisional and final invoices
Systems we work beside
  • Komatsu DISPATCH
  • MineStar
  • Maptek MaterialMRT
  • Orica FRAGTrack
  • SAP
  • Your LIMS

Read through the interface each system already has. Nothing is written to it without a person's approval.

What stays with your team
RoutingProposed for your dispatcher.Decided by your dispatcher.
How it runs
Questions
How do we know it's worth it?
Two weeks in your records first. We measure your cost per shift reconciliation and your error rate today, and the price is set against those numbers before anything is built.
What if our data is messy?
That is the normal case. The map measures what your camera feeds, payload readings, and records actually look like, and the price is set only for the inputs that pass a threshold we both sign.
Who decides where a truck goes?
Your dispatcher. Each flagged load is shown with the camera frame and the readings beside it, and the routing is left for your dispatcher to decide.
Will it work with DISPATCH or MineStar?
It reads through the access your system already offers. Some systems need that access switched on or licensed, and we say which before we start.
Where does our data go?
It stays in your environment. Nothing is used to train a model, and nothing is kept once the work is done.
The other stages
Start a conversation.